Projects in Brief
No. | Project Name | Client | Scope of Project | Total Weight | Date Of Execution | Duration |
---|---|---|---|---|---|---|
1 | Ghaen Cement plant | Azarab Industrial Co. | Engineering work and supervision for manufacturing of equipments | 1500 tons | 1991 | 8 months |
2 | Ghaen Cement plant | Ghaen Cement Co. | Manufacturing of grate cooler | 90 tons | 1992 | 5 months |
3 | Kordestan Cement plant | Kordestan Cement Co. | Manufacturing of cooler department including grate cooler, electrostatic precipitator, fans, ducting, stack, conveying system, Kiln hood | 400 tons | 1993 | 13 months |
4 | Ourmieh White Cement plant | Ourmieh White Cement Co. | Manufacturing of main Cement production equipment including preheater cyclones and ducts, rotary Kiln inlet and outlet, clinker cooler, stacker and reclaimer | 1200 tons | 1992, 1993 | 14 months |
5 | Shahroud Cement plant | Shahroud Cement Co. | Manufacturing of grate cooler | 90 tons | 1993 | 4 months |
6 | Saveh White Cement plant | Saveh White Cement Co. | Manufacturing of stacker, reclaimer, cooler Packing plant ,ducting | 400 tons | 1993, 1994 | 6 months |
7 | Krasnovodesk Petrolium Refinery plant | PÖRNER Co. | Chemical Reactor | 20 tons | 1994 | 1 months |
8 | Hegmatan Cement plant | Hegmatan Cement Co. | Manufacturing of cooler department | 400 tons | 1995 | 12 months |
9 | Ardebil Cement plant | Ardebil Cement Co. | Manufacturing and erection of metallic hoppers for gypsum and pozelan silos | 150 tons | 1995 | 3 months |
10 | Bojnurd Cement plant | Bojnurd Cement Co. | Engineering work and supervision for local manufacturing | 3800 tons | 1995 , 1996 | 24 months |
11 | Karoon Cement plant | Karoon Cement Co. | Manufacturing and erection of equipment (belt conveyors galleries, steel structures, main stack, metallic hoppers for silos) | 1200 tons | 1995 , 1996 | 14 months |
12 | Lavan Island desalination plant (capacity : 1800 cubic meter per day) | Kish Water & Power Co. | Manufacturing of a MED type desalination plant | – | 1995, 1996 | 4 months |
13 | Mobarakeh Steel ladle furnace plant | Mobarakeh Steel Co. | Manufacturing of 3 sets for steel temperature measurement and sampling system | 12 tons | 1996 | 4 months |
14 | Almahdi Aluminium plant | Almahdi Aluminium Co. | Desalination plant water supply structure | 20 tons | 1996 | 3 months |
15 | Bandar Abbas Port luffing crane (15 tons capacity) | Mangan Co. | Manufacturing of links for ship unloader luffing crane | 50 tons | 1996 | 3 months |
16 | Navvab Steel Structure | Tehran Abadsaz Co. | Manufacturing And Erection of Steel Structure | 4000 tons | 1996 | 9 months |
17 | Ahwaz Rolling & Piping plant | Ahwaz Rolling & Piping Co. | Manufacturing of two heavy duty type over head cranes for slab yard of Ahwaz Rolling and Piping Co. | 250 tons | 1996, 1997 | 5 months |
18 | Chrome Chemical plant | Chrome Chemical Co. | Manufacturing of production Equipment | 250 tons | 1997 | 2 months |
19 | Zanjan Zinc production plant | Iran Rooy Gostar Co. | Manufacturing & erection of production line equipments | 300 tons | 1998 | 3 months |
20 | Khuzestan Cement plant | Khuzestan Cement Co. | Preparation of drawings and specifications for total spare & wearing parts | 3000 tons | 1998 | 5 months |
21 | Abhar Brezent plant | Abhar Brezent Co. | Manufacturing of steel structure for production hall (7000 s. meter) of a textile plant | – | 1998 | 4 months |
22 | Ahwaz Rolling & Piping plant | Ahwaz Rolling & Piping Co. | Erection of two heavy duty type over head cranes for slab yard of Ahwaz Rolling and Piping Co. | 300 tons | 1998 | 2 months |
23 | Khak Rangbar Plant | Khak Rangbar Co. | Manufacturing and erection of Equipments of Product Line | 700 tons | 1997 | 16 months |
24 | Esfarayen seamless tube Production plant | Esfarayen Pipe Production Co. | Manufacturing and erection of steel structures | 2200 tons | 1998 | 14 months |
25 | Bandar Imam petrochemical complex (MTBE project) | Azarab Industrial Co. | Manufacturing of 10 heat exchangers | 90 tons | 1999 | 5 months |
26 | Saipa new production line | Saipa car production Co. | Supply & erection of structures for utilities of production line | 110 tons | 2000 | 2 months |
27 | Darab Cement plant | Darab Cement Co. | Manufacturing of grate cooler | 120 tons | 1999 , 2000 | – |
28 | Technical Publication | Technical Publication Co. | Supply & Erection of steel structure | 400 tons | 1999, 2000 | 2 months |
29 | Bushehr Cement plant | Bushehr Cement Co. | Design and supply and erection of gypsum transport | 100 tons | 2000 | 5 months |
30 | Darab Cement plant | Darab Cement Co. | Manufacturing of 4 electro-static precipitators | 650 tons | 2000 | 12 months |
31 | Darab Cement plant | Darab Cement Co. | Engineering & Supply of of stacker & reclaimer | 50 tons | 2000 , 2001 | 14 months |
32 | Darab Cement plant | Darab Cement Co. | Erection & commissioning of stacker & reclaimer | 350 tons | 2000 , 2001 | 8 months |
33 | Mazandaran Cement plant | Mazandaran Cement Co. | Erection & commissioning of stacker & reclaimer 2000 ton per day | 850 tons | 2000 | 12 months |
34 | Imam Khomeini International Airport. | Van Der Lande Industries | Manufacturing of local portion and total erection of baggage handling conveyor | 200 tons | 2001 | 10 months |
35 | Isfahan Cement plant | Isfahan Cement Co. | Complete design (mechanical/electrical, control ) manufacturing, supervision, erection & commissioning of stacker & reclaimer | 250 tons | 2000 , 2001 | 12 months |
36 | Saveh White Cement plant | Saveh White Cement Co. | Manufacturing of equipment for extension Production line | 500 tons | 2001 | 12 months |
37 | Abadan Petrolium Refinery renovation | Azarab Industrial Co. | Manufacturing , assembling & testing of tube bundles for heat exchangers | – | 2001 | 1 month |
38 | Pers Intl. Transport CO. (PTB) | Pers Intl. ,Transport CO. (PTB) | Supply of roller feeder for feeding of bulk stone in to 20 ft container. | – | 2001 | 6 months |
39 | Benvid White Cement plant | Benvid White Cement Co. | Local Manufacturing and erection For more than 2000 tons of steel components and equipment. | 2000 tons | 2002 , 2003 | 12 months |
40 | Lia fiber glass production plant | Mavad-e-Vijeh Lia Co. | Local supply of a complete dryer of non woven, Tissue made of glass fiber, batch plant, Steel structure | 250 tons | 2002 | 8 months |
41 | Shahr-e-Kord Cement plant | Azarab Industrial Co. | Technical and Consulting Services | – | 2002 | 2 months |
42 | Mobarakeh steel plant | IRITEC Co. | Manufacturing of supporting steel structure for air coolers | 200 tons | 2003 | 6 months |
43 | Benvid White Cement plant | Benvid White Cement Co. | Commissioning of the whole production line | 4000 tons | 2003 | 14 months |
44 | Kashan Cement plant | Kashan Cement Co. | Manufacturing of grate cooler & electro filter | 800 tons | 2003 , 2004 | 6 months |
45 | Petrochemical free zone | F.M.C. Co. | Manufacturing , mounting & erection of marine arm loading in cooperation with F.M.C. of France | 100 tons | 2004 | 3 months |
46 | Naein Cement plant (4800 ton per day) | Naein Cement Co. | Manufacturing & erection of steel structure for buildings beside the production line | 300 tons | 2004 | 5 months |
47 | Masjed Soleiman Gas treating plant | NIGC Co. | Manufacturing of storage tanks | 150 tons | 2004 | 9 months |
48 | Kashan Cement plant | Kashan Cement Co. | Manufacturing of vertical roller mill | 200 tons | 2003 , 2004 | 5 months |
49 | Farsnov Cement plant | Farsnov Cement Co. | Manufacturing of components of Farsnov cement project (3000 ton per day) and erection of whole preheater, main stack and tertiary air duct | 1700 tons | 2003 , 2004 | 12 months |
50 | Abadan Refinery plant | SGC Co. | Manufacturing of 32 marine arm loadings | 150 tons | 2004 | 9 months |
51 | Sungun copper plant | IRITEC Co. | Manufacturing & preassembling of bridge Steel structure | 650 tons | 2005 | 7 months |
52 | Kermanshah petrochemical plant | Namvaran Engineering Co. | Local manufacturing of chain scraper in cooperation with Claudius Peters of France | 300 tons | 2005 | 8 months |
53 | Khorasan gypsium plant | Khorasan Gypsum Co. | Local manufacturing & erection of E.P. | 250 tons | 2005 | 9 months |
54 | Tehran Cement (new production line) | Tehran Cement Co. | Local manufacturing of vertical cement mill | 1000 tons | 2005 | 8 months |
55 | Ardakan Pelletizing plant | Chador maloo Industrial & Mining Co. | Local manufacturing of kiln shell | 300 tons | 2005 | 9 months |
56 | Upgrading of Hegmatan cement plant | Cemag GmbH Germany | Turn key execution of upgrading of Hegmatan cement plant from 2300 ton per day to 3200 ton per day in cooperating with Cemag Co. | 700 tons manufact uring /1200 tons erection | 2005 | 9 months |
57 | Firouzkouh cement project | Faraz Firouzkouh Cement Co. | Local manufacturing and erection of equipments including crushing, mixing bed raw material handling, preheater, kiln & cooler departments | 5000 tons manufactu ring /6200 tons erection | 2006 | 16 months |
58 | Hegmatan cement (new production line) | Hegmatan Cement Co. | Local manufacturing of stacker & reclaimer and vertical raw & cement mills for Hegmatan cement plants | 1200 tons | 2006 | 6 months |
59 | Tehran Cement | Tehran Cement Co. | Erection of raw mill & cement mills department for Tehran cement Co. (new 3400 ton per day production line) | 2500 tons | 2006 | 8 months |
60 | Ardakan Pelletizing plant | Chador maloo Industrial & Mining Co. | Local manufacturing of Equipment for production line of Ardakan Pelletizing plant. | 4000 tons | 2006 | 14 months |
61 | Ardakan Pelletizing plant | Chador maloo Industrial & Mining Co. | Erection of kiln departments equipment including kiln shell and accessories | 1100 tones | 2006 | 9 months |
62 | Shemal cement | Cemag GmbH Germany | Total local manufacturing & erection works of Shemal cement upgrading project from 2000 tpd to 4000 tpd | 2500 tons manufactu ring /3000 tons erection | 2005 | 15 months |
63 | Azarabadegan Oil refinery | Azarabadegan Co | Manufacturing& Supply of 15 reactors& Pressure vessels | 150 tons | 2006 | 8 months |
64 | Shahr-e-kord cement plant | Azarab Industries Co. | EPC execution of raw material mixing bed | 450 tons | 2007 | 14 months |
65 | Shahr-e-kord cement plant | Azarab Industries Co. | EPC execution of Raw mill silos, kiln feeding, cement silos | 200 tons | 2007 | 16 months |
66 | Golestan cement | Peyvand -e Golestan Co. | Local manufacturing of crusher and mix bed | 500 tons | 2007 | 12 months |
67 | Shahr-e-kord cement plant | Azarab Industries Co. | EPC execution of packing plant. | 70 tons | 2007 | 16 months |
68 | Neyzar Cement plant. | Neyzar Cement Co. | Local manufacturing of equipment for crushing& Mixing bed departments | 500 tons | 2008 | 10 months |
69 | Naeen Cement plant | Cemag Cimansazan Consortium Co. | Local manufacturing of total & equipment of production line | 8000 tons | 2006 to 2008 | 24 months |
70 | Gole-gohar Steel complex | Cemag Gmbh | Local manufacturing of total & equipment of production line | 200 tons | 2008 | 4 months |
71 | Golestan Cement | Peyvand-e- Golestan Co. | Local manufacturing of kiln shell. | 180 tons | 2008 | 3 months |
72 | Golestan Cement | Peyvand-e- Golestan Co | Erection of crusher and mix bed | 750 tons | 2009 | 6 months |
73 | Saveh Grey cement | Saveh cement co. | Local manufacturing of dedusting systems (bag houses and electrofilters) | 1200 tons | 2008 | 12 months |
74 | Neyzar Cement | Neyzar Cement Co. | Erection and commissioning of equipment, for crushing & mixing bed departments | 1000 tons erection | 2009 | 10 months |
75 | Mobarakeh steel complex | Mobarakeh Steel Co. | Manufacturing& procurement of 4 new bag houses | 1040 tons | 2009 | 10 months |
76 | Ghadire-e Iranian Steel Co. | IRITEC | Manufacturing& procurement of belt conveyors structures | 340 tons | 2009 | 4 months |
77 | Naeen Cement | Cemag Cimansazan Consortium | Complete erection of equipment and steel structures of the production line | 12000 t equip. 9000 t st.struc. | 2009, 2010 | 20 months |
78 | Assalooyeh power plant | Mapna boiler Via daryapala Energy | Manufacturing &procurement of carbon active and coalester filters | 80 tons | 2010 | 5 months |
79 | Naeen Cement | Naeen Cement Co | Manufacturing & erection of heavy fuel storage tank | 500 tons | 2011 | 4 months |
80 | Torbat-e-jam Cement | Gharbe Asia Cement Co | Manufacturing and procurement of Raw meal and Cement mill departments | 1100 tons | 2011 | 12 months |
81 | Kiasar Cement | Kiasar Cement Co | Manufacturing of kiln shell and clinker cooler | 200 tons | 2011 | 4 months |
82 | International Neuroscience Institute | Imam Reza charity organization | Manufacturing and Erection of special kind of steel structure | 2300 tons | 2012 | 6 Months |
83 | Pasargad steel plant | Pasargad steel complex | Delivery of some complete equipment | 28 machines | 2013 | 5 months |
84 | Raftari trade center | Raftari | Manufacturing and erection of Roof garden(special steel structure ) | 230 tons | 2013 | 3 months |
85 | Sirjan iron ore concentrate production plant | Meyarsanat khavarmianeh Co. | Manufacturing &supply of belt conveyors(8belt conveyors ) | 230 tons | 2013 | 6 Months |
86 | Sarit | Sarieh shomal company | Supply and Manufacturing of cement base waved panel ,61 equipment of production line | 110 tons | 2014 | 5 Months |
87 | Hydrated lime plant | Kordestan cement Co. | Supply and Manufacturing of transport equipment with separator and hydrator | 150 tons | 2014 | 5 Months |
88 | Margoon cement plant | Toseegostar helal khavarmianeh Co. | Local Manufacturing and erection of crusher and mixing bed departments equipment | 520 tons manf. 730 tons erection | 2013 | 7 Months |
89 | Goharzamin iron ore | Gostaresh foulad Co. | Supply and Manufacturing of connecting 74 chutes | 200 tons | 2014 | 6 Months |
90 | Mazandaran pulp & paper industries | Chooka industrial Co. | Manufacturing and replacing of tree deskinner drum | 35 tons | 2014 | 1 Month |
91 | Upper structure for restaurant | Espinas international hotel | Manufacturing & erection of structural work | 200 tons | 2014 | 3 Months |
92 | Sungun copper concentrate plant | Moassesseye amin,gharargh ahe khatam | Erection work (mechanical , electrical ,piping, control ) and commissioning of copper concentrate plant phase II | 3000 tons equipment 50000 ” piping | 2013 | 15 Months |
93 | Sangan II Pelletizing plant | Azaran Co. | Manufacturing of material handling equipment | 400 tons | 2015 | 7 Months |
94 | Shahre aftab | Kashalot Co. | Manufacturing & erection of curtain walls | 300 tons | 2015 | 4 Months |
95 | Soufian cement | Soufian cement co. | Upgrading and renovation of existing reclaimer | 100 tons | 2015 | 6 Months |
96 | Sangan concentrate 5 Mt pa | Meyar sanat khavaremianeh | EPC execution of iron ore transport belt conveyors . 7500 mtotal length | 3500 tons | 2016 | 12 Months |
97 | Sana center sky light | Sana investement group | Manufacturing and erection of trade center sky light | 35 tons | 2015 | 2 Months |
98 | Alborz coal washing project | Fakour sanat tehran | Manufactoring and supply of bins and tanks | 150 tons | 2015 | 2 Months |
99 | Tehran Cement 9th factory | Tehran cement | Erection of Kiln department | 700 tons | 2016 | 5 Months |
100 | Ghadir Steel production plant | Aerzen Havasaz Parsian Co. | Manufacturing of 6 big Silencers on ducting out of Blowers | 100 tons | 2020 | 4 Months |